Footprints Resort Preston Beach

Works – Filtration upgrade

Infiniti Designer Pools were contracted to install a new fully automated filtration system to the existing pool.suport tableta bord puma suede classic velvet sneakers in cordovan leather calfskin velvet tongue and toe cap handcitruspers brandon aiyuk jersey youth nike air max ivo black and white nike calças de treino shampoo isdin lambdapil Mexico mallas para hombre nike meilleur lampe uv Purchase college team jerseys at a discounted price and of high quality adidas yeezy 700 v3 miroir terzo mallas para hombre nike billige matratzen cheap jerseys 

Downtime to the guests had to be kept to a minimum during the works and the pool had to be brought into line with the Department of Healths code for Aquatic Facilities.

Infiniti Designer Pools worked with the Department of Health to ensure that the new filtration system was appropriate to ensure high quality water management and also that the water was balanced and tested to the required levels after the new installation.